Already got for the initial build (some of these may get upgraded later):
- Thrige-Titan TTL-200C motor
- AXE7245 90V 450A controller
- KP-L 2000W 87.6V charger
- 0-5k throttle
- 25pcs CALB SE40AHA 40 Ah cells
- Cycle Analyst instrumentation
On order at this time:
- Nothing
- Another 25pcs of cells (CALB 40, 60 or 70 Ah, preferably CA-series)
- Motor cooling (EVTV BlowMe or something else)
- Main contactor
Low priority items needed (car won't pass MOT without):
- JLD404 or similar voltage meter for main contactor activation
- DC to DC converter
- Auxiliary 12 V battery
- Vacuum pump (very important)
- PTC or liquid cabin heating (liquid is actually easier, but more expensive)
- High voltage warning stickers everywhere
Vanity items:
- ELECTRIC emblem of some sort
- Braided straps for cell interconnects for improved durability
The list may be incomplete and/or outdated. Just like me.